Sage 100 Production Management Cost Roll-Up Register Summary

Summary

What is included in the PM Cost Roll-Up Register?

Resolution

The Cost Roll-Up Register allows the calculation of a finished good or sub-assemblies cost. It includes Material and Labor costs which are based on the Bill or Template. 

Update Intermediate Bills – Select this check box to include the recalculation of costs for Sub Assemblies. If this option is not selected, the value from the Item Masterfile for the Inventory Cost Type selected will be used as the cost of the sub-assembly. 

Once the register is printed, it can be updated to change the Standard Cost value of the finished goods included on the Cost Roll-Up Register.