How to Convert an Engineering Bill to a Standard Bill in Sage 100
Summary
How to convert an Engineering Bill to a Standard Bill
Cause
Since a Standard Bill must represent an actual inventory item, an item must be created in Item Maintenance that matches the bill
Resolution
- Open Inventory Management, Main, Item Maintenance
- Create an item that matches the Engineering Bill you want to convert.
- Open Bill of Materials, Main, Bill of Materials Maintenance
- Change the Bill Type from Engineering to Standard